Overpass at Long Bien Intersection

Year built 2015
Address Long Bien District, Hanoi, Vietnam
Investor Him Lam Joint Stock Company
Construction Xuan Mai Corp

The 809.7 m long flyover has 16 spans, including 1 main bridge with a concrete composite slab steel box girder system, 5 continuous spans with a total length of 310 m and a 494.9 m long guide bridge system arranged in diagram, with prestressed reinforced concrete box girder structure.

Featured projects

Buon Kuop Hydroelectric Power Plant

Krong No District,Buon Ma Thuot City, Dak Lak Province, Vietnam

2006 - 2007

Trung Luong Bridge

Ho Chi Minh City, Vietnam

2006 - 2007

Bai Chay Bridge

Ha Long City, Quang Ninh Province, Vietnam

2003 - 2006