Bai Chay Bridge

Year built 2003
Address Ha Long City, Quang Ninh Province, Vietnam
Investor Project Management Unit 18
Design Japan Institute of Bridges and Structures
Construction Xuan Mai Corp
General contractor A joint venture between Shimizu and Sumitomo Mitsui

Bai Chay Bridge is located on Highway 18, connecting two parts of Ha Long city, Hon Gai and Bai Chay, through the mouth of Cua Luc river where it empties into Ha Long Bay. This is a single-plane reinforced concrete prestressed cable-stayed bridge with the world's longest span with a main span of up to 435 m. Bai Chay Bridge was inaugurated in December 2006.
Clearance below: 50 m
Total length: 1,106 m